D13. Macpherson / Potong Pasir

CT Macpherson— Overview

Macpherson

  • 66 Units
  • Completion: 2030
  • Industrial (B1)
  • Freehold

Site Plan & Facilities

GOLD-CLASS STANDARDS

A rare freehold B1 industrial development in MacPherson, CT Gold is crafted for businesses valuing quality, permanence and prestige. Comprising 63 exclusive production units and 3 large canteens, it offers a dynamic, adaptable environment for modern enterprises.

GOLDEN GATEWAY

Strategically located in MacPherson, CT Gold offers seamless connectivity to expressways, arterial roads and commercial hubs. Just minutes’ walk to Potong Pasir MRT, with a short drive to the Central Business District, accessibility is effortless.

GOLDEN EDGE

With 3 large canteens within the development that has been granted permanent approval, coupled with nearby eateries and amenities, daily convenience becomes a rare privilege. Accessibility and comfort converge, nurturing productivity and a fulfilling work-life balance.

TIMELESS • VALUABLE • VICTORIOUS

RARE FREEHOLD IN SINGAPORE

WELCOME TO THE GOLDEN ARRIVAL

YOUR GOLDEN BREAK STARTS HERE

Floor Plans

Layouts

Ct Macpherson's Factsheet


  • Project Title: Proposed Erection Of 8-Storey Ramp-Up Multi-User Light Industry (Business 1) Development (63 Production Units) With Mezzanine AT 1ST, 3RD And 4TH Storey, Industrial Canteens (3 Units) And Communal Facilities On Lot 06986C MK24 At 5 Lorong Bakar Batu (Geylang Planning Area).

  • Project Location: No. 5 Lorong Bakar Batu.

  • Developer: CT Macpherson Pte Ltd (UEN 202521531C).

  • Land Category: Industrial B1.

  • Tenure: Estate In Fee Simple (Freehold).

  • Site Area: 4590.30 sqm (49,409.98 sqft).

  • Factory Type: Partial Ramp up B1 / Flatted B1.

  • No. of Units: 63.

  • Storey Height: 8 Storey.

Design Brief / Proposal:

  • Lifts: 2 Passenger Lifts (min 18 Pax) and 1 Service Lift (2.8 ton).

  • Communal Facilities: 1 Pavilion with BBQ Pit.

  • Vehicle Provisions: Provision for Future EV Lots, Handicapped Carpark Lots, Motorbike Lots, and Lorry Lots (7.5m Rigid Frame). Carpark Lots total is 4.

  • Industrial Canteens: 3 units.

  • Kitchen Exhaust Duct (KED) provision connected to the Industrial Canteen is provided.

  • Gas: Provision of Supply Gas Pipe from Centralized LPG cylinder is provided with cap off at the front unit.

Unit Features (Roller Shutter):

  • Roller Shutters will be provided at units on Level 1, 2, 3, and 4.

  • Level 1, 3 & 4: 3000 mm width x 2700 mm high.

  • Level 2: 3000 mm width x 3600 mm high.

Mezzanine & Unit Knock Down:

  • Mezzanine is available on Level 1 (3 units), Level 3 (7 units), and Level 4.

  • Adjoining walls between two side-by-side units can be knocked down (Subject to authorities requirement).


    *For Canteen Stack 02: 150 Amp (3 Phases); For Canteen Stack 01 & 03: 200 Amp (3 Phases)

contact section background
Singapore Condo Review | singaporecondoreview.com  model image

Make an Enquiry

Book an appointment with us. Alternatively, please fill the form to get for information. We will get back to you as soon as possible.
ENQUIRE SALES TEAM
contacts icon